Our company produce vertical turbine pump,vertical long axis pump, vertical type condensate pump ,vertical wet pit pump,right Angle gear box
Manufacturer of vertical turbine pumpFocus on vertical wet pit pump, right Angle gear box
HOTLINE:+8618507312158+8613974960765
Contact us
Vertical turbine pump manufacturers
HOTLINE::+8613974960765
Mobile:+8618507312158
Email:sale@ljpump.net
Address :China's hunan province changsha furong road long xiang industrial park
Your position: HOME >> Knowledge >> vertical turbine pump
vertical turbine pump

Starting of LC Vertical Long Axis Pump

时间:2022/7/16 21:46:52 来源:Lijia Machinery 点击:

Starting of LC Vertical Long Axis Pump


(1) Close the outlet gate valve and pressure gauge cock, and connect the cooling and lubricating water of LC vertical long shaft pump.

(2) Check the flow rate and pressure of cooling and lubricating water. If the flow rate and pressure of cooling and lubricating water are not satisfied, the LC vertical long-axis pump is not allowed to start.

(3) Start the motor after the flow and pressure of the vertical long-axis pump meet the requirement and the water supply is more than 3 minutes. When the pump reaches the normal speed, open the pressure gauge cock, gradually open the gate valve in the outlet pipe, and adjust to the required working conditions. When the gate valve of the outlet pipe is closed, the continuous working time of the vertical long axis pump shall not exceed 2 minutes.

(4) If the vertical long shaft pump is sealed with packing, tighten the pressing nut on the packing cover evenly, so that the liquid leaks out in droplets, and pay attention to the temperature rise in the packing chamber.


Be careful:

1. In any case, the pump can not operate for a long time when the outlet gate valve is closed. Otherwise, it will cause pump vibration or even transport liquid vaporization, which may cause equipment damage and personal injury.

2. Packing cover should not be pressed too tightly. A small amount of leakage can lubricate the packing. Stopping leakage will cause packing burns and shaft bushing scratches.

3. When transporting sewage, guide bearings must pass cooling and lubricating water. The insufficient flow rate and pressure of cooling and lubricating water will seriously affect the service life of the pump. It takes more than 3 minutes to pass through the water before starting, and then turn off the cooling water after the pump stops turning completely.

4. When transporting clean water, the guide bearing can not pass cooling and lubricating water, but the protective pipe must be cancelled.

 


Online Service
Contact

TEL

+8618507312158

+8613974960765

WeChat
Online
Service